United States Department of Agriculture
Natural Resources Conservation Service
National Water Management Center Go to Accessibility Information
Skip to Page Content
Photo of River Bend





Survey Data Flint Creek near Kansas, Oklahoma

Easting Northing Station-Profile Elevation w/respect to gage datum Description Water Depth (meters)
1000.0 1000.0   36.09 RM 11 ODOT Brass Cap, US bridge, US Handrail, RHS  
1332.1 1000.0   35.10 RM 9 Chiseled square US Bridge, US Handrail, LHS  
967.3 1924.1   6.52 TBM 1 - Stake set in LHS Gravel bar  
914.2 1933.8   7.36 TBM 2 - Stake near stump in water  
-115.30 2647.70   8.26 TBM 3 - Right Bank Stake in XS  
-55.60 2819.50   12.70 TBM 4 - Left Bank Stake in XS  
1273.8 1382.4   14.66 Total Station Setup #1 - Resection RM 11 & 9 on LHS bank HI = 14.66+5.65'
229.1 2598.8   7.19 Total Station Setup #2 - Resection TBM 1 & 2 on RHS Gravel bar HI = 7.19+5.44'
-84.8 2766.3   12.25 Total Station Setup #3 - Resection TBM 3 & 4 on LHS Bar HI = 12.25+5.53'
        Point of Zero Flow ~5.79 ft gage datum (Weir Crest) ((Leakage))  
1166.1 1000.0 0 5.79 Centerline US Edge of US 412 Bridge ~Gage Station 0.10
914.2 1933.8 967      
304.1 2594.7 1867 1.42 Thalweg 1.49
262.3 2628.8 1921 1.96 Thalweg 1.36
234.7 2655.6 1959 4.17 Thalweg 0.66
188.3 2661.0 2006 5.02 Thalweg 0.30
146.1 2683.6 2054 5.11 Thalweg 0.39
104.0 2684.8 2096 5.29 Thalweg 0.32
57.8 2680.7 2142 5.66 Thalweg 0.33
-3.0 2694.1 2204 5.94 Thalweg 0.32
-71.3 2686.3 2273 6.69 Thalweg 0.20
-124.0 2687.4 2326 6.10 Thalweg 0.38
-180.2 2729.1 2396 5.89 Thalweg 0.43
-244.0 2757.0 2465 4.51 Thalweg 0.87
-294.8 2778.7 2521 5.59 Thalweg 0.55
-337.7 2749.6 2573 3.90 Thalweg 1.05
-378.5 2762.3 2615 4.28 Thalweg 0.94
-415.7 2782.7 2658 3.62 Thalweg 1.12
-449.5 2790.1 2692 4.36 Thalweg 0.92
-496.7 2802.4 2741 5.18 Thalweg 0.65
-548.7 2822.1 2797 5.85 Thalweg 0.45
-565.3 2841.7 2822 6.91 Thalweg 0.23
-571.8 2861.0 2842 7.10 Thalweg 0.22
252.6 2540.3   12.00 Top of Point Bar  
242.4 2531.2   12.48 Top of Point Bar  
197.8 2574.4   11.13 Top of Point Bar  
135.8 2714.8   9.60 Bank Full Indicator  
2.7 2728.3   10.79 Bank Full Indicator  
        Cross Section @ Sta 2,316 - points shot left to right  
-45.0 2835.4 0 22.54 Cross Section pts - Top Left Bank  
-48.0 2829.6 7 16.97 Cross Section pts  
-56.0 2817.3 21 11.41 Cross Section pts  
-57.8 2810.7 28 10.31 Cross Section pts  
-58.1 2807.9 31 6.97 Cross Section pts - LEW Slough  
-57.9 2807.7 31 6.35 Cross Section pts  
-61.2 2804.0 36 4.10 Cross Section pts  
-63.3 2800.7 40 3.66 Cross Section pts - Thalweg Slough  
-68.2 2793.0 49 4.70 Cross Section pts  
-68.4 2793.2 49 7.05 Cross Section pts - REW Slough  
-68.8 2791.4 51 9.07 Cross Section pts  
-72.2 2787.8 56 10.91 Cross Section pts  
-78.4 2776.7 69 12.27 Cross Section pts  
-83.2 2762.0 84 12.26 Cross Section pts  
-85.4 2757.0 90 10.18 Cross Section pts  
-87.3 2751.3 96 10.14 Cross Section pts  
-88.8 2743.4 104 10.13 Cross Section pts  
-90.3 2739.5 108 8.87 Cross Section pts  
-91.0 2737.5 110 8.48 Cross Section pts  
-91.1 2736.5 111 7.61 Cross Section pts  
-91.5 2735.0 113 7.26 Cross Section pts - LEW Main Channel  
-92.6 2730.6 117 6.72 Cross Section pts  
-95.8 2724.6 124 7.19 Cross Section pts  
-98.6 2713.1 136 7.18 Cross Section pts  
-107.3 2694.2 157 6.60 Cross Section pts  
-111.6 2682.0 170 6.34 Cross Section pts - Thalweg  
-118.8 2657.6 195 7.37 Cross Section pts - REW Main Channel  
-120.4 2650.6 202 7.79 Cross Section pts  
-120.9 2648.7 204 8.49 Cross Section pts  
-122.2 2645.7 208 11.12 Cross Section pts  
-125.7 2638.6 215 12.39 Cross Section pts  
-130.5 2628.2 227 14.13 Cross Section pts  
-137.5 2617.4 240 16.80 Cross Section pts  
-142.40 2606.70 252 19.87 Cross Section pts  
-155.50 2583.60 278 23.35 Cross Section pts  
-165.0 2558.70 305 24.53 Cross Section pts - Top Right Bank  
-115.4 2647.6   8.25 TBM 3 back sight to close  

< Back to Flint Creek near Kansas, Oklahoma